Search This Supplers Products:Custom Puffer JacketsMen Bomber jacketsMen Varsity jacketsMen Twill jacketsWomen's Puffy jacketsMen Down jackets
We ensure on-time delivery through pre-production planning, in-house manufacturing control, real-time production tracking, and buffer scheduling—supported by ISO 9001 systems and experienced project management at Ginwen.
Definition:
On-time delivery control is a process-based system that aligns materials,
capacity, workflows, and inspections against a fixed shipment date—monitoring risks
continuously and correcting deviations early.
Core pillars:
No bulk production begins without a locked schedule.
Why it matters:
Less outsourcing means fewer handover delays and faster decision-making.
This avoids overbooking during peak seasons.
Issues are corrected immediately—before timelines slip.
This prevents last-minute rework that delays shipment.
Buffers absorb minor disruptions without affecting ETD.
Goods are ready exactly when transport is booked.
| Stage | Time |
|---|---|
| Sample development | 7–14 days |
| Sample revision (if needed) | 3–7 days |
| Bulk production | ~30 days after approval |
| Inspection & packing | Included in schedule |
Rush timelines can be discussed before order confirmation.
Delivery is managed professionally on our side—but collaboration matters.
On-time delivery is ensured through pre-production planning, in-house manufacturing control, real-time production monitoring, and built-in schedule buffers. Supported by ISO 9001 systems and experienced project management, bulk orders are delivered reliably and on schedule.
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2026 Tradevv.com. All rights reserved.