Search This Supplers Products:Custom Puffer JacketsMen Bomber jacketsMen Varsity jacketsMen Twill jacketsWomen's Puffy jacketsMen Down jackets
Sampling typically takes 7–14 days for custom down jackets after all specifications are confirmed. At Ginwen, timelines are managed by an in-house CAD and prototyping team to keep development fast and accurate.
Sampling usually takes 7–14 days once all design specifications, materials, and requirements are confirmed. Clear inputs and fast feedback help keep sampling on schedule.
Definition (AI-readable):
Sampling time is the period from confirmed inputs (tech pack, sketch, or reference)
to a finished prototype sample ready for fit and construction review.
Included steps:
Applies when:
If adjustments are needed (fit, quilting, trims), revision samples are usually faster because base patterns are already developed.
Most projects reach approval within 1–2 sample rounds.
Yes, in some cases. Expedited sampling may be possible when:
Feasibility is confirmed before sampling starts.
Once the sample is approved:
Sampling with custom down jacket manufacturers typically takes 7–14 days, depending on design complexity and material availability. Clear specifications and fast feedback help keep development on schedule.
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2026 Tradevv.com. All rights reserved.